Demobilization Checklist |
After the last core has been taken, there are many things to be done before reaching the dock.
- Inventory of all lab supplies: make a list of items that need to be replaced or odered.
- Type up an inventory of all the samples on board.
- QC the data in the spreadsheets. Have two people double check the entries and sign off on the data sheet.
- Check photos against database. Make a note in the database for any missing photos with explanation.
- Give an electronic copy of the core data and photos to the client rep.
- E-mail Jim with a total count of minivane readings taken - he needs this for billing.
- E-mail a copy of the core data and the inventory lists to Joe Dickinson and Brad Bernard at joedickinson@tdi-bi.com and bradbernard@tdi-bi.com
- Clean, lube and store all equipment:
- Mini vane- report any damaged parts or needed replacements to the GeoTech Lab Manager
- Core Liner Cutters
- VERY important to clean, lube and change blade!!
- Torvanes
- Knives
- Spatulas
- Jack Stands holding core rack
|