Offshore Lab- Demobilization List

lab button
Page last updated 01 December 2010
Demobilization Checklist
After the last core has been taken, there are many things to be done before reaching the dock.
  • Inventory of all lab supplies: make a list of items that need to be replaced or odered.
  • Type up an inventory of all the samples on board.
  • QC the data in the spreadsheets. Have two people double check the entries and sign off on the data sheet.
  • Check photos against database. Make a note in the database for any missing photos with explanation.
  • Give an electronic copy of the core data and photos to the client rep.
  • E-mail Jim with a total count of minivane readings taken - he needs this for billing.
  • E-mail a copy of the core data and the inventory lists to Joe Dickinson and Brad Bernard at joedickinson@tdi-bi.com and bradbernard@tdi-bi.com
  • Clean, lube and store all equipment:
    • Mini vane- report any damaged parts or needed replacements to the GeoTech Lab Manager
    • Core Liner Cutters - VERY important to clean, lube and change blade!!
    • Torvanes
    • Knives
    • Spatulas
    • Jack Stands holding core rack